Document existing markings and site constraints so that material and application discussions can start with the right information.

Record the existing surface

Collect photographs of the markings, pavement and areas requiring attention. Include available information about the previous marking system and installation.

Explain the project constraints

Describe traffic access, working windows, equipment and the scope of the proposed maintenance work. Share the applicable project specification.

Review the next steps

Discuss material options and the need for site assessment or trials with the relevant technical team. Confirm the proposed approach against the project requirements before work starts.

This guide is an introduction. Use the selected product’s technical and safety instructions and the applicable project specification for installation.